Switch-Pros Legend Stickers¶
Available Legend Kits¶
- Switch-Pros x Rigid Industries legends
- Switch-Pros x Baja Designs legends
- Horizontal switch legends
Sources: - SDHQ Switch-Pros x Rigid - SDHQ Switch-Pros x Baja Designs - SDHQ Horizontal Legends
Mounting Solutions¶
Switch-Pros Mounting Options¶
- OE Electrical Mount: Overland Equipped
- 5th Gen 4Runner Mount: SD Offroad
- LX570 Mount: SDHQ
- GX470 Mount: SDHQ
- Universal Keypad Mount: SDHQ
- Ball Mount: Bulletpoint
Reference Article¶
Installation Planning¶
Phase 1: Engine Bay Power Distribution¶
- Install dual battery system with Redarc charger
- Complete "Big 3" electrical upgrade
- Mount Engine Bay SPOD 1 & 2
- Run main power feeds from batteries
- Install input breakers
Phase 2: Interior Power Distribution¶
- Mount Interior SPOD (behind 2nd row)
- Mount Interior Fuse Block (console or 2nd row)
- Install MSD relay block
- Run power feeds from battery/switched power
- Create wire management at "behind 2nd row" junction
Phase 3: Circuit Installation¶
- Install roof penetrations (lights, antennas, power)
- Run door-mounted courtesy lights
- Install seat heater circuits
- Complete console power circuits (inverter, USB, etc.)
- Install communication equipment (ham radios)
Phase 4: Testing & Documentation¶
- Test each circuit individually
- Label all circuits clearly
- Create as-built wiring diagram
- Document any deviations from plan
Safety Notes¶
Critical Safety Requirements¶
- Proper Fusing: Every circuit must have appropriate fuse/breaker protection
- Wire Gauge: Use appropriate wire gauge for amperage and length
- Connections: All connections must be soldered or properly crimped
- Heat Shrink: Protect all connections with adhesive-lined heat shrink
- Grounding: Establish solid ground points (not vehicle body for high-current)
- Labeling: Label every wire at both ends
Fire Prevention¶
- Never exceed 80% of fuse/breaker rating for continuous loads
- Use proper gauge wire (see chart below)
- Ensure all high-current wires avoid heat sources
- Secure all wiring away from moving parts
- Use grommets for all firewall penetrations
Wire Gauge Reference (12V DC)¶
| Amperage | 5-7 ft | 7-10 ft | 10-15 ft | 15-20 ft |
|---|---|---|---|---|
| 5A | 18 AWG | 18 AWG | 16 AWG | 14 AWG |
| 10A | 16 AWG | 14 AWG | 12 AWG | 12 AWG |
| 15A | 14 AWG | 12 AWG | 10 AWG | 10 AWG |
| 20A | 12 AWG | 10 AWG | 10 AWG | 8 AWG |
| 30A | 10 AWG | 8 AWG | 6 AWG | 6 AWG |
Reference Resources¶
IH8MUD Forum Threads¶
- The Big Three Electrical Upgrade (see Joplin notes)
Vendor Resources¶
- Switch-Pros installation manuals
- Redarc battery charger documentation
- ARB air compressor wiring diagrams
Last Updated: 2026-01-20 Source: Consolidated from Joplin Notes (circuits.md, Center Console Wire Runs.md, LC under the hood.md) As-Built Updates: 2025-12-28 - Added 3x SPOD BantamX configuration, Behind 2nd Row Power Distribution Panel, winch installation status, dual battery operational status As-Built Updates: 2025-01-14 - Added Yaesu FTM-510 and Uniden R8 radar detector to Blue Sea Group A key-switched circuits (A3, A4) As-Built Updates: 2026-01-18 - Complete Rigid Adapt 40" light bar wiring documentation, corrected Blue Sea circuit assignments (A2=Yaesu, A4=Rigid controller, A5=Uniden), documented dual MSD relay bank architecture (MSD1 for power/lighting, MSD2 for seat heaters), added wire colors to all Blue Sea circuits As-Built Updates: 2026-01-20 - Added V6D2UHNB seat heater switch pinout documentation with wiring diagram PDF (modifications/interior/V6D2UHNB_Switch_Wiring_Diagram.pdf)